Author Archive for: alison
About Alison
This author has yet to write their bio.Meanwhile lets just say that we are proud Alison contributed a whooping 31 entries.
Entries by Alison
Elastotec adhesion testing
June 18, 2020 in Vlog /by AlisonElastotec Direct Bond Ceramic Lagging
May 7, 2020 in Vlog /by AlisonHOT VULCANISED LAGGING APPLICATION
March 30, 2020 in Technical Bulletin /by AlisonIron Ore Port Facility High Tension Bend Pulley – Elastotec Polyurethane Lagging
November 1, 2019 in Case Studies /by AlisonIn November 2017 a major iron ore port facility in the Pilbara decided to replace the ceramic lagging on a high tension bend pulley – the ceramic lagging had suffered physical damage on one edge that had exposed the pulley shell (Photo#1). With a capacity of around 180 million tonnes/ annum of iron ore the port operates 24/7 year round and so reliability of the conveyor system is critical to achieving the maximum ore through put.
Spare Pulleys – Hot Vulcanised vs Cold Bonded Lagging
November 1, 2019 in Technnical Papers /by AlisonSpare pulleys are held so that in the event that an operational pulley requires replacement this can be done quickly and efficiently at the timing dictated by the mine maintenance personnel. The reason for changing a pulley broadly falls into two categories.
• Change out during a planned maintenance shut
• Emergency change out due to catastrophic pulley failure
Elastotec localised slippage explanation
October 11, 2019 in Vlog /by AlisonElastotec expands lagging operations
September 9, 2019 in News /by AlisonOur dedicated teams in Australia and Vietnam working really hard to understand lagging performance, and to engineer solutions that provide the longest possible lagging service life under all conditions.
Direct Bond Ceramic Lagging adhesion shear test
June 7, 2019 in Vlog /by Alison90 degree tension pull adhesive test
May 20, 2019 in Vlog /by AlisonELASTOTEC PTY LTD
1/61 Somersby Falls Rd,
Somersby 2250 NSW
Australia
T: + 61 2 8987 1922
E: sales@elastotec.com.au
Pulley Lagging And Wear Panel Products
Iron Ore Port Facility High Tension Bend Pulley – Elastotec Polyurethane LaggingNovember 1, 2019 - 8:22 pm
Spare Pulleys – Hot Vulcanised vs Cold Bonded LaggingNovember 1, 2019 - 5:14 pm
Elastotec expands lagging operationsSeptember 9, 2019 - 10:32 am
Consequences of catastrophic failure with cold bonded lagging for new mining projectsMay 16, 2019 - 3:05 pm