Speak with one of our experienced engineers

Contact us

Pulley Lagging Solutions News

PT Sandvik Lagging Technicians

PT Freeport

Grasberg Mine PT Freeport Indonesia – PROK/Elastotec Hot Vulcanised Ceramic Lagging Case Study. The Grasberg open pit mine is the largest gold mine and the third largest copper mine in the world.

Read More
PT Kembla Coal Terminal

PT Kembla Coal Terminal

In early 2012 Port Kembla Coal Terminal (PKCT) identified a need to refurbish the drive pulleys on their two Stacker Reclaimer units. Included in this refurbishment was replacement of the lagging.

Read More
Bonding Adhesion

Bonding Adhesion

All ceramic tiles and polyurethane inserts are bonded using a two part system that provides proven 100% rubber tear adhesion. Using purpose built equipment the adhesive

Read More

Let’s talk

If you work in the mining industry, involved in conveyor maintenance, pulley manufacturing, conveyor design and conveyor maintenance, then, we would like to work with you to bring engineered pulley lagging solutions to the industry.