Mine Site Support Programme for Pulley Lagging Performance
AIM: Increase mine production output with reduced operating costs and reduced OH&S risk.
HOW: Elastotec is a specialist engineering company with a focus on conveyor pulley lagging – this is all we do.
We believe that pulley lagging should last as long as the mechanical components of the pulley – as the cost of conveyor down time for mining companies is measured in thousands of dollars per minute.
A lot of thought and consultation has gone into developing lagging products that minimise down time, and at the same time are kind to the belt. We have a number of high performance lagging systems that provide proven and cost effective solutions.
With a long history in technical elastomers and composites, our staff have used their expertise to change pulley lagging from a consumable item that has to be regularly replaced, to an engineered component that is designed for the service life of the pulley.
Our goal is to increase conveyor availability by onsite consultation with mine maintenance & reliability personnel.
Your conveyor operation expertise
Elastotec Lagging expertise
Improved pulley
lagging performance
Guaranteed performance
Lagging failures we can eliminate
Ceramic tile debonding
Debonding from the pulley shell
Edge lifting
Joint separation
Lifting at joints between strips
Pulley shell corrosion at lagging joints
Noise and vibration due to uneven thickness
Lagging failures we can reduce
Ceramic tile cracking
Carryback buildup on lagging
Ceramic tile wear
Loss of dimples on ceramic tiles
Pulley shell corrosion
Wear of the bottom belt cover
Lagging deterioration with outdoor ageing
Damage to the lagging and to the belt for high tension bend pulleys in contact with the dirty side of the belt
If you work in the mining industry, involved in conveyor maintenance, pulley manufacturing, conveyor design and conveyor maintenance, then, we would like to work with you to bring engineered pulley lagging solutions to the industry.