Speak with one of our experienced engineers

Contact us

Lagging Selection Tag

Vale's Vargem Grande Iron Ore Conveyor Lagging Problem

Vale’s Vargem Grande Iron Ore Conveyor Lagging Problem

Vale-operated Vargem Grande mine site is located in the state of Minas Gerais, Brazil and contains 2.53 billion tonnes of proven and probable iron ore reserves, making it the world’s fourth biggest iron ore mining operation. The Vargem Grande site comprises three open-pits: Tamandua, Capitao do Mato and Aboboras.

Read More »
BlueScope Steel Port Kembla Image 1

BlueScope Steel Port Kembla

BlueScope steel was formerly a business within BHP Billiton that became and independent company in 2002. With well known brands such as COLORBOND®, ZINCALUME® and GALVABOND® BlueScope provides engineered building solutions to meet a multitude of end uses.

Read More »
PT Sandvik Lagging Technicians

PT Freeport

Grasberg Mine PT Freeport Indonesia – PROK/Elastotec Hot Vulcanised Ceramic Lagging Case Study. The Grasberg open pit mine is the largest gold mine and the third largest copper mine in the world.

Read More »
PT Kembla Coal Terminal

PT Kembla Coal Terminal

In early 2012 Port Kembla Coal Terminal (PKCT) identified a need to refurbish the drive pulleys on their two Stacker Reclaimer units. Included in this refurbishment was replacement of the lagging.

Read More »

Let’s talk

If you work in the mining industry, involved in conveyor maintenance, pulley manufacturing, conveyor design and conveyor maintenance, then, we would like to work with you to bring engineered pulley lagging solutions to the industry.