
Reduce maintenance time
80% less replacement time with Magnefast. Increase conveyor operating time. Do more during shutdown. Save on labour time. No crane needed.
80% less replacement time with Magnefast. Increase conveyor operating time. Do more during shutdown. Save on labour time. No crane needed.
Keep your staff safe with no external scaffolding, no electrical, hydraulic or pneumatic tools – no drop from heights risks or stud cutting.
Magnefast wear panel solutions: proven performance for large Copper & Coal Mines, Power Station, Sand & Gravel Quarry, Iron Ore Export Port.
No scaffold/studs or tools needed to install, great for locations with difficult access, no hole-stud alignment needed, no panel gaps.
Elastotec Magnefast Ceramic Wear Panels were chosen for the application in this colliery transfer chute as the use of studded wear panels would have been very difficult and time consuming to install.