Video: Adhesion test

Video: Adhesion test

  1. When we do the Direct Bond Shear Test it’s very important to get the tiles in the right position, so that the load is applied to both tiles at the same time.
  2. So we make a jig, and the jig allows us to have the tiles positioned in exactly the correct location. So once the sample is set we undo the jig and we have our test piece ready to go.
  3. Adhesion testing to be done a minimum of 14 days after the test pieces are made.
  4. Calculated shear force on tiles: 20.8MPa